skip to navigation

Estimated TSA Security Wait Times

1 Minute

TSA Pre

15 Minutes

General Line

Airport News

Terminal Roadway Construction

September 10th, 2023 |

Starting September 11th through September 27th, the Lehigh-Northampton Airport Authority (LNAA) will begin a multi-phase rehabilitation project for the Arrivals & Departures roadways at Lehigh Valley International Airport (ABE).

ARRIVALS (Lower Roadway) CLOSURE

  • Starting Monday September 18th at 12:00 AM through September 27th; the ARRIVALS Roadway will be CLOSED for all vehicular traffic.
  • Traffic will be routed to the DEPARTURES (Upper Roadway) and the SHORT/LONG TERM Parking Lots.
  • All delivery vehicles will be permitted to park curbside on the Upper Level in the Commercial Vehicle Parking Only area located beyond the rideshare shelter.
  • Uber/Lyft (rideshare) will remain in the bus loop of the Multimodal Transportation Center.
  • Pedestrian traffic through the parking tunnel will remain OPEN

Translate

Translate the Lehigh Valley International Airport (ABE) website into your language of choice!